Crown Valley Airport Building C

Addition to existing manufacturing building for new single serve container lines.  Building has 4 concrete stem wall around perimeter and openings will be cut in existing wall to travel between buildings.

Cap America Addition

Large warehouse designed for rack storage.  LED lighting with occupancy sensor, air conditioned using duct sock for duct work.  Connected to existing facility with 10 x 15 connector building.

Busenbark Granite

Sargent assisted owner with concrete and building design. The building supports 5crane systems.

Missouri Cobalt

Cobalt Production Building.  Building erection was done over owner’s equipment and mezzanines.

Confidential Client

Industrial manufacturing project which involved full design-build services. Work included structural steel, metal building systems, concrete foundations, electrical and mechanical.

CertainTeed Bag Filler Addition

Building was located on a steep hill side requiring the use of a 80′ snorkel lift. Special work hours and coordination required with CertainTeed so trucks were not blocked and loading was not interrupted.